BTO Renovation — building wardrobes that fit the rooms
A BTO Renovation starts the moment you collect your keys, and the clock is tighter than many expect. New flats come with decent base finishes, so spend only where life improves.

Deposit and Final Inspection
HDB collects $500 for up to three rooms and $1,000 for four-room and larger, refunded after a compliant inspection.
Stay within approved scope so it passes first time and your money returns without a fight or a return visit.
Walk the flat with the approved plan on the day of inspection so you can point to exactly what was permitted.
Spend the buffer on things you touch daily, like tap fittings and door hardware, not a wall you forget.
A Calm Palette for a New Flat
Neutral walls with one accent age well and make compact rooms feel larger. Keep the palette consistent across spaces for calm.
Lighter tones suit the typical 2.6-metre HDB ceiling, where a dark room can feel like the walls are closing in.
Carry one wood tone through the cabinets and doors so the flat reads as designed rather than assembled from separate sales.
Spend the buffer on things you touch daily, like tap fittings and door hardware, not a wall you forget.
Choosing a BCA-Licensed Contractor
Only a BCA-licensed contractor on the HDB Directory of Renovation Contractors may do the works. Verify before signing anything.
Contracts of S$5,000 and above are covered by the CaseTrust scheme with itemised Open Book pricing from 1 October 2024.
Shortlist three and compare their itemised quotes line by line, not just the bottom number, which hides the real differences.
Mark the permit deadline on the calendar the day you collect keys; it arrives faster than you think.
When to Begin Your BTO Renovation
The clock starts at key collection. The renovation permit must be applied for within three months and stays valid for three months.
Line up your contractor and design before keys land so you hit the ground running instead of scrambling in week one.
Use the waiting period to collect references and quotes, so you are ready the moment the door swings open.
Keep at least one room flexible so a future buyer can turn it into a nursery, office or guest space.
Timeline From Keys to Move-In
Expect eight to fourteen weeks including permit, carpentry lead time and site works. Order long-lead items early to avoid stalls.
Coordination between trades is what keeps the date realistic, so a single project lead helps more than you might expect.
Pad the move-in date by two weeks. The flat will be ready when it is ready, and a buffer protects your sanity.
Live in the flat a month before committing to the full works; the right projects become obvious.
A 5-Room BTO Before-and-After
A typical transformation adds custom carpentry, better lighting and a calmer palette while keeping the structural shell intact.
The biggest gains come from storage and workflow, not from moving walls, which HDB will not permit anyway.
Owners who plan the carpentry first usually end up with a flat that looks expensive without spending like it.
Live in the flat a month before committing to the full works; the right projects become obvious.
A BTO flat gives you a strong base; your job is to add only what improves daily life. Plan room by room, hit the permit window, and enjoy the result.